Wednesday, May 14, 2008
Lots Done!
Well, since the last time I updated this site I've drilled 17 holes below the waterline (of course, no leaks!), removed and replaced 3 seacocks with new ones, rudder removal and repair, installed 5 keel bolts, repaired the 'Smile' on her keel, installed a 9 gallon holding tank and removed and replaced the head with a new Jabsco model, and of course all the plumbing that goes with it, and of course the bottom paint and numerous little repairs to the gel coat.
TT will be here in three days so I finished her 'none to soon!
Pic's:
1) Coming outta the water (notice 'beard' of zebra mussels on keel)
2) Old crusty valves (scary to look at considering their below the waterline)
3) Jake inside the cabin
4) New seacocks, plumbing and holding tank
I'll continue on next post.......
Jake
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment